Product Level Specifications
Structure
- Earthquake Resistant RCC frame structure with masonry infill/ RCC wall
Floors
Living/Dining/Foyer
Bedroom
Workers/Utility Room
Balcony
Main Staircase
FireEscape Staircase
Lift Lobby
Walls
External
Internal
- Acrylic Emulsion/Texture Paint on POP
Lift Lobby walls
Ceilings
Doors/ Windows
Internal
Main Door
Wardrobes
- Pre-laminated board modular wardrobes
Bathrooms
- Fixtures and fittings
- Tiles on flooring and on walls
- Water Closet, Shower area
Kitchen
- Modular Kitchen, counter, fixtures and fittings
- Tiles on flooring and on walls as applicable
Utilities and Facilities
Security
- Door Phones
- 24 Hour manned security on entrance gates
Air-conditioning
Ventilation
- Exhaust fans in kitchen and bathrooms.
Landscaping
- Landscaped common areas to preserve and enhance the natural characteristics of site
Water Supply
- Water Supply through underground lines/overhead tanks
Sewage Water
- Soiled water drainage into main sewer outside property
Storm Drainage
- Storm water drainage system integrated for rainwater harvesting
Fire Protection
- Fire detection / sprinkler system as per fire safety norms
Main Electrical Supply
- Electrical wiring in concealed conduits with modular switches and power back up
Telephone/Data
- Telephone cable pre-wired into all rooms
- Cabling for internet access as per design
Services
- Maintenance of common area on chargeable basis
Notes and Remarks:
- 1. Brands and makes are indicative only. Actuals will be of equivalent of make and quality as per availability at the time of execution.
- 2. Wood being natural materials has inherent characteristics of colour and grain variations.
- 3. All floor plans, layout plans and specifications are indicative and are subject to change as decided by the company or by a competent authority
- 4. In the absence of availability of imported materials, equivalent quality Indian substitutes will be used.
- 5. All works shall be carried out as per standard practice.
- 6. All works shall be executed as per the standard architectural design and details worked out by our Project Architects.